DIVISION   WISE   STATUS   OF   ROAD   UNDER  3RD CIRCLE, UDAIPUR.

 

 

Sl. No.

Name of division.

Total length of road (in km.).

Length of Black Top road (in km.).

Soling (in km.).

Earthen (in km.).

No. of SPT Bridge.

No. of RCC Bridge.

No. of Bailey Bridge.

No. of Boxcell /  Culvert

Remarks.

1

2

3

4

5

6

7

8

9

10

11

1

Southern Division No. I , Udaipur

334.91

197.41

179.26

10.90

25

1

21

18

 

2

Southern Division No. II, Santirbazar.

709.00

218.00

409.00

82.00

29

2

53

12

 

3

Amarpur Division, Amarpur

312.25

143.00

112.50

56.75

24

4

26

18

 

4

R & B Division, Sabroom.

340.00

187.00

136.00

17.00

30

0

11

34

 

 

 

 

 

(Er. S. C. DAS)

Superintending Engineer,

3rd Circle, PWD, Udaipur, South Tripura.

 
 

 

 

 

 

 

 

 

 

 

 



Achievement of ongoing works under 3rd Circle, PWD, Udaipur during the year 2005-06 with target for 2006-07.

 

Name of Division.

Sl. No.

Item of work.

 

Target for 2005-06. (in Km.)

Achievement for 2005-06 (in Km.)

Target for ongoing works 2006-07. (in Km.)

Remarks.

1st & 2nd Qtrs

3rd & 4th Qtrs

Total

1

2

3

4

5

6

7

8

9

Southern Division

No.-I, Udaipur.

1

Formation (in Km.)

30.00

25.63

4.00

10.00

14.00

 

2

Soling (in Km.)

35.00

34.20

15.00

20.00

35.00

 

3

Metaling (in Km.)

20.00

16.74

20.00

15.00

35.00

 

4

Carpeting / Re-carpeting (in Km.)

30.00

24.71

15.50

25.50

41.00

 

5

Box Cell Bridge (in nos.)

3

3

0

6

6

 

6

Slab Culvert (in nos.)

2

2

4

6

10

 

7

Bailey Bridge (in nos.)

3

3

0

3

3

 

Southern Division

No.-II, Santirbazar.

1

Formation (in Km.)

18.00

15.60

-

-

14.40

 

2

Soling (in Km.)

28.00

23.77

-

-

20.30

 

3

Metaling (in Km.)

18.00

13.50

-

-

22.50

 

4

Carpeting / Re-carpeting (in Km.)

32.00

20.50

-

-

34.50

 

5

Box Cell Bridge (in nos.)

5

3

-

-

7

 

6

Slab Culvert (in nos.)

12

14

-

-

5

 

7

Bailey Bridge (in nos.)

1

0

-

-

3

 

Amarpur Division, Amarpur.

1

Formation (in Km.)

9.00

3.20

3.00

5.00

8.00

 

2

Soling (in Km.)

7.00

5.20

5.00

15.00

20.00

 

3

Metaling (in Km.)

2.80

1.50

10.00

18.00

28.00

 

4

Carpeting / Re-carpeting (in Km.)

22.00

11.20

12.00

25.00

37.00

 

5

Box Cell Bridge (in nos.)

2

1

3

5

8

 

6

Slab Culvert (in nos.)

11

8

5

8

13

 

7

Bailey Bridge (in nos.)

1

0

1

3

4

 

R & B Division, Sabroom.

1

Formation (in Km.)

18.50

27.20

15.00

20.00

35.00

 

2

Soling (in Km.)

34.17

32.30

15.00

25.00

40.00

 

3

Metaling (in Km.)

53.00

27.50

7.00

18.00

25.00

 

4

Carpeting / Re-carpeting (in Km.)

53.00

27.21

10.00

20.00

30.00

 

5

Box Cell Bridge (in nos.)

10

7

5

6

11

 

6

Slab Culvert (in nos.)

8

11

5

3

8

 

7

Bailey Bridge (in nos.)

3

0

3

0

3

 

(Er. S. C. DAS)

Superintending Engineer,

3rd Circle, PWD, Udaipur, South Tripura.

 
 










Power

The Superintendent Engineer, Electrical based at Udaipur holds the overall responsibility of the department in the district, assisted by Executive Engineer, Division-IV Udaipur and Division-IV Bagafa. The department divisions are further networked in to Electrical sub-divisions at Udaipur, Kakraban, Amarpur, Belonia, Sabroom, Bagafa and Internal Sub-Division at Udaipur . There ia also a Transmission Division at Banduar, Udaipur.

The Power department has realized revenue of Rs. 8 crores, 31 lakhs and 42 thousand over the last financial year. Electrification of 64 MI schemes and 22 PHE Schemes have been executed in the district.

Under 25 point TD schemes, 49016 km and 14 sub-stations have been covered. For electrification under Special area based development projects, the same has been achieved for 47.01 km and 10 sub-stations.

The achievement in electrification for other habitations and intensive electrification are 184.01 km/ 51 sub-stations and 132.52 km/ 6 sub-stations respectively.

Power department has taken up renovation work over 38.74 km and 5 sub-stations while electrification is in progress for 2 hamlets.